日韩欧洲精品无码AV,99国产午夜精品一区二区天美,精品久久免费一区二区三区四区,久久综合图区亚洲综合图区,久久久久亚洲AV免费观看,精子网久久国产精品,亚洲AⅤ无码一区二区二三区性色,亚洲精品国产电影,亚洲资源在线观看,婷婷五月丁香在线

  • 
    
  • <ul id="yy6ca"></ul>
  • <del id="yy6ca"></del>
    <ul id="yy6ca"></ul>
    <strike id="yy6ca"><menu id="yy6ca"></menu></strike>
    Hotline:400-880-1556

    English




    Project Introduction

    The process of gradually forming a conductive path on the surface of a solid insulating material under the combined action of an electric field and an electrolyte is called leakage tracking. The ability of the surface of the insulating material to resist tracking is called tracking resistance.

    Test purposes

    The tracking resistance test is mainly a test to simulate whether the conductive substances deposited on the surface of the insulating material of live parts of different polarities caused by household appliances in actual use cause the creeping, breakdown short circuit and fire hazard of the surface of the insulating material. During the use of electrical products, due to environmental pollution, there are dirt and moisture on the surface of the insulating material, which causes electrical leakage, which leads to corrosion and damages the insulating performance. The test specified in this standard is an accelerated test that simulates extremely harsh conditions to check whether the insulation material will form a trace of leakage, which can distinguish the ability of the solid insulation material to resist tracking in a short time and ensure that the product is under specific environmental conditions. Safe to use.

    Scope of application

    It is suitable for the research, production and quality inspection departments of lighting equipment, low-voltage electrical appliances, household appliances, machine tool appliances, motors, power tools, electronic instruments, electrical instruments, and information technology equipment. It is also suitable for insulating materials, engineering plastics, electrical connectors, Accessories industry.

    Method Standard

    For details, see "GB/T 4207-2012 Solid insulating materials under wet conditions compared to the tracking index and tracking resistance index measurement method"

    Test analysis

    The factors influencing this test can be summarized as follows:

    Sample pretreatment

    As the standard requires that the surface of the sample should be clean, and the sample will inevitably have release agent, oil, dust and other contaminants after the manufacturing, transportation, transfer and other links to the final test. Therefore, the sample surface must be cleaned. At present, there are several cleaning methods used for this test in China:

    a. Distilled water b. Dry cotton ball c. Eraser d. Anhydrous alcohol. And the cleaning procedures are different. Distilled water will change the humidity of the surface of the sample. Wiping with a dry cotton ball is more difficult to remove grease. Wiping with a rubber eraser will change the true condition of the sample. Anhydrous alcohol can both clean the grease and volatize on its own, which is ideal. Improper cleaning methods have a greater impact on the test results.

    Flatness of test surface, test size and thickness

    If the test surface is uneven or has scratches, it will affect the test results and cause the test results to deviate. The size of the sample does not meet 15mm × 15mm × 3mm. During the test, the electrolyte may flow out from the edge of the sample, resulting in a shortening of the combined action time of the electric field and the electrolyte. The thickness is less than 3mm, and the heat capacity of the material becomes smaller, resulting in faster heat dissipation, resulting in The test results are affected.

    The resistivity and purity of the electrolyte

    The resistivity and purity of the electrolyte are two important factors in the tracking test. Because of the conductivity meters commonly used for platinum-black conductivity electrodes, their platinum-black conductivity electrodes are prone to inerting, which leads to inaccurate resistivity testing. So how to use a simple method to determine the performance of platinum black conductivity electrode is good and accurate measurement

    The resistivity of the test solution is the key i. The problem of the solution containing impurities is usually easily overlooked, mainly due to the impureness of the distilled water used to prepare the electrolyte.

    Relative tracking index and tracking resistance index

    Relative Tracking Index (CTI): The highest voltage value of five test samples that can withstand the test process of 50 drops without generating tracking tracking failure and continuous flame. It also includes a description of the characteristics of the material when 100 drops are tested.

    (PTI): Five test samples can withstand the test process of 50 drops without generating tracking voltage failure and continuous flame test voltage value.


    Online consultation

    Online consultation

    Recommend
    • Brazil ANATEL Certification

      Brazil ANATEL Certification

      ANATEL certification is a mandatory certification for telecommunications equipment or related equipment by the Brazilian National Telecommunications Administration (Agência Nacional de Telecomunica??es), including wireless communication equipment, wired communication equipment and related auxiliary equipment; this certification ensures that telecommunications equipment sold in the Brazilian market meets Brazil\'s technical standards and regulatory requirements, and guarantees the product\'s quality requirements such as radio frequency, electrical safety, electromagnetic compatibility, and electromagnetic exposure. If the product entering Brazil does not complete ANATEL certification, it may face fines, seizures, and other penalties.

    • COC certification in Algeria

      COC certification in Algeria

      COC certification in Algeria is a mandatory certification for products exported to Algeria, ensuring that the products comply with the country\'s safety, quality, and technical standards. The certification process includes document review, product testing, and factory inspection. Products that pass certification can be legally sold in the local market, protecting consumer interests and promoting fair trade.

    • Saudi Arabia GCC Certification

      Saudi Arabia GCC Certification

      GCC certification is the abbreviation for Gulf Cooperation Council certification, which is a mandatory certification requirement for products entering the market in Saudi Arabia and other countries in the Gulf region.

    Tracking

    The process of gradually forming a conductive path on the surface of a solid insulating material under the combined action of an electric field and an electrolyte is called leakage tracking. The ability of the surface of the insulating material to resist tracking is called tracking resistance.

    Get a quote
    а√天堂资源在线| 天天综合色天天综合色HD| 日韩高清在线不卡| 中文字幕欧美人妻精品一区| 91丨九色丨国产在线观看| 亚洲日韩乱码中文字幕| 国产av无码专区亚洲av果冻传媒| 国产激情精品一区二区三区| 国产精品v欧美精品∨日韩 | 色婷婷五月综合久久| 99久久国产综合精品swag| 亚欧免费无码aⅴ在线观看 | 成年女性特黄午夜视频免费看| 国产又滑又嫩又白| 粗一硬一长一进一爽一a级| 久久久久人妻精品一区二区三区| 国产人成视频在线观看| 激情无码人妻又粗又大 | 国产精品污www一区二区三区| 欧美深性狂猛ⅹxxx深喉| 无码中文人妻在线一区二区三区| 无码国产色欲xxxxx视频| 天天爽夜夜爽夜夜爽精品视频| 国产voyeur精品偷窥222| 风流少妇按摩来高潮| av无码久久久久不卡蜜桃| 国产初高中生视频在线观看| 亚洲AV成人片色在线观看| 乱色精品无码一区二区国产盗| 麻豆蜜桃69无码专区在线| 国产呦系列免费口在线观看| 欧美精品高清一区二区灬| 伊人色综合一区二区三区| 久久99精品久久久久久噜噜| 熟妇人妻中文AV无码| 亚洲熟女一区二区三区| 无码熟妇AvDvD| 亚洲精品无码激情AV| 国模大胆一区二区三区| 三年片在线观看免费观看大全一 | 亚洲精品无播放器在线播放|